Vixxo | Facilities Management News

2025 Facility Management SLA Guide: Building a High Performing FM Program

Written by Vixxo Management | Dec 26, 2025 3:00:00 PM

A national facility management service level agreement connects day to day store operations to measurable outcomes: uptime, safety, speed, quality, and cost. An effective SLA defines scope, priorities, response and restore commitments, preventive maintenance cadence, compliance requirements, data and reporting, technology integrations, pricing controls, and governance. It must also account for modern realities like remote diagnostics, ESG reporting, refrigerant regulations, cyber risk, and severe weather resilience.

Strategic Overview

The goal of a national SLA is a consistent customer experience across markets, with predictable risk, spend, and performance. That requires precise definitions and verifiable metrics, not just “best efforts.” Use the components below to make commitments measurable and auditable across your portfolio.

SLA components and example targets:

Component

What to specify

Example 2025 target

Scope & asset classes

Include store formats, back-of-house, exterior, and covered asset lists by trade

All HVAC, refrigeration, life-safety, electrical, plumbing, doors, signage, lighting, jan/san, exterior services

Geographic coverage

States/regions, urban vs. rural, and service deserts

100% coverage in 50 states; rural response windows adjusted by distance bands

Hours of service

Standard hours, after-hours, blackout windows

24/7 for life-safety and refrigeration; 7–7 local for routine

Priority matrix

Impact-based definitions and triage flow

P1 life-safety/food safety; P2 customer-impact; P3 routine; P4 planned

Response & restore

Time to acknowledge, dispatch, arrive, and restore per priority

P1: acknowledge 5 min, dispatch 15 min, onsite 2 hrs, restore 4 hrs; P2: onsite 4–8 hrs

Uptime targets

Asset or system availability by class

Refrigeration 99.5%; POS and entrance/egress doors 99%

Preventive maintenance

Cadence by asset with checklists

RTUs semiannual; filters quarterly; refrigeration quarterly; electrical PM annual

Remote triage

Use of RMS/IoT and approval to resolve remotely

Attempt remote resolution on all P2/P3; document data trail in CMMS

Compliance & safety

Standards and laws the provider must meet

OSHA, FDA Food Code, ASHRAE 62.1/55, NFPA 70E; EPA Section 608 for refrigerants

KPIs & reporting

Definitions, formulas, and cadence

SLA attainment, MTTR, first-time fix rate, work order aging; weekly ops + monthly QBR

Data & integrations

CMMS of record, API, SSO, data schema, attachments

Two-way API for status, notes, photos, quotes, invoices; SSO enabled

Parts & inventory

Availability for critical spares and lead-time rules

Critical spares on hand; OEM lead-time mitigation plan within 48 hrs

Pricing & controls

Rate cards, trip fees, markups, NTE, quotes

NTE at WO level; parts markup cap; quotes > NTE within 24–48 hrs

Warranty & recalls

Validation and routing rules

Auto-route in-warranty assets; recall compliance within 24 hrs

Environmental metrics

Energy, leak rate, waste, and ESG reporting

ENERGY STAR plan; refrigerant annual leak rate below 20% for commercial systems

Cyber & privacy

Protection for connected assets and data

Align with NIST Cybersecurity Framework; role-based access; incident notice in 24 hrs

Business continuity

Disaster response playbooks and surge staffing

Named incident commander; regional storm playbooks; 4-hr mobilization

Governance & improvement

RACI, escalation, reviews, and RCA

24/7 escalation; monthly QBR, quarterly RCA on recurring failures; ISO 41001 alignment

 

Why the Checklist Items Matter

Priorities and response commitments

Clear definitions ensure life safety, food safety, and revenue critical issues receive fast action. This reduces downtime, spoilage, and customer service impact.

Preventive and predictive maintenance

Predictive maintenance can reduce maintenance costs by 25 to 30 percent and reduce breakdowns by up to 75 percent. Strong SLAs define cadence and documentation requirements that support a shift from reactive work to planned care.

Safety and regulatory alignment

OSHA, FDA Food Code, ASHRAE, and NFPA requirements shape how technicians must work. Codifying them in the SLA protects customers, employees, and compliance posture.

Energy and refrigerants

ENERGY STAR programs typically deliver 2 to 10 percent annual savings. Refrigerant requirements under EPA Section 608 require defined leak thresholds, documentation, and repair timelines. SLAs should make these measurable.

Data, integration, and cyber

Clear CMMS, API, SSO, and documentation standards support transparency and traceability. For connected assets, NIST alignment reduces cyber and operational risk.

Management system discipline

ISO 41001 provides a model for leadership, planning, operations, evaluation, and improvement. It helps structure QBRs, governance, and long term planning.

Bringing it all together

Strong SLAs give facilities leaders the structure they need to manage asset health, service quality, and spend across a complex portfolio. When expectations are clear and data backed, teams make faster decisions, technicians work more efficiently, and stores operate with fewer surprises. Building this discipline into your SLA is the foundation for a safer, more resilient, and more cost effective operation.

Want to talk facilities?

Leave a comment or question below and we'll reach out!